Managerial Accounting — Exam 1 Learner (Ch. 1–3)
Ohio State  ·  Fisher College of Business

Managerial Accounting
Exam One Learner

Every item on the review sheet, taught from zero — cost concepts, job-order costing, and the manufacturing cost flow. Work top to bottom, check off modules as they click.
Chapters 1 · 2 · 3 16 Modules 68 Flashcards Progress saved automatically
Mastered
0 / 16
CH. 1

Managerial Accounting & Cost Concepts

Vocabulary chapter — nail the definitions and the behavior table
01

Managerial vs. Financial Accounting

Review item: "Key differences"

Same company, same transactions, two completely different reporting jobs. Financial accounting produces reports for people outside the company — investors, creditors, the IRS. Managerial accounting produces reports for people inside the company — the managers who have to plan, control, and decide.

That single difference (who reads it) drives every other difference. Outsiders need reports they can trust and compare across companies, so financial accounting is rule-bound, historical, and covers the whole company. Insiders need reports that help them act, so managerial accounting is flexible, forward-looking, and drills down into segments.

The Comparison You'll Be Tested On
DimensionFinancial AccountingManagerial Accounting
AudienceExternal — investors, creditors, regulatorsInternal — managers, supervisors
PurposeReport on past performance & financial positionPlanning, controlling, decision-making
RulesMust follow GAAP / IFRSNo GAAP required — whatever is useful
Time orientationHistorical (what happened)Future-focused (estimates, budgets, forecasts)
Scope / detailCompany-wide summarySegments: products, departments, jobs, customers
Timeliness vs. precisionPrecision & verifiability emphasizedTimeliness & relevance emphasized (a good estimate now > a perfect number later)
FrequencyQuarterly / annualAs often as needed — daily, weekly, on demand
Mandatory?Yes, for public companiesNo — purely optional, done because it's useful
Audited?Yes, by independent CPAsNo
Memory Hook

Financial = Foreign eyes, Formal rules, Facts from the past.
Managerial = Managers, Make decisions, Might-happen future.

Exam Trap

"Relevance vs. precision" gets flipped constantly. Managerial accounting deliberately sacrifices precision for relevance and speed — a manager would rather have a rough number today than an exact number next month. Financial accounting is the opposite.

Check yourself — which one?

1. A report showing profitability of the Columbus store only, prepared weekly for the regional manager. → Managerial (segment, internal, frequent).

2. An audited balance sheet filed with the SEC. → Financial (external, GAAP, audited).

3. A budget projecting next year's factory utilities. → Managerial (future, internal, not GAAP).

4. Which is legally required? → Financial accounting. Managerial is optional.

02

Costs for Decision Making: Opportunity, Sunk, Differential

Review item: "Define and give example"

These three exist only because managers make choices. They aren't cost categories on a financial statement — you will never see "Opportunity Cost" as a line item. They're labels that tell you whether a number belongs in your decision at all.

Opportunity Cost

Definition: the potential benefit you give up when you choose one alternative over another. It's the value of the best option you didn't take.

  • Example: You work a shift at Sweetbriar earning $120, or you go to a concert. The opportunity cost of the concert is the $120 of wages you gave up.
  • Example: A factory uses a machine to make Product A. That same machine could have produced $40,000 of contribution margin on Product B. The $40,000 is the opportunity cost of making Product A.
  • Example: Using a warehouse you own to store inventory instead of renting it out for $5,000/month. Opportunity cost = $5,000/month.
Key Point

Opportunity costs are never recorded in the accounting records — no cash changes hands — but they are always relevant to a decision. If a question asks "should this be considered?", the answer for opportunity cost is yes.

Sunk Cost

Definition: a cost that has already been incurred and cannot be changed by any future decision. It is always irrelevant.

  • Example: You paid $400,000 for a machine two years ago. Whether you keep it or scrap it, that $400,000 is gone. Sunk.
  • Example: $60,000 already spent on R&D for a product you're deciding whether to launch. Sunk — ignore it.
  • Example: The non-refundable $85 you paid for a ticket to a game you no longer want to attend.
Exam Trap

Book value of an old asset (original cost minus accumulated depreciation) is a sunk cost — irrelevant to a keep-or-replace decision. The disposal/salvage value you could get for it, however, is relevant, because that amount still depends on what you decide.

Differential / Incremental Cost

Definition: the difference in cost between two alternatives. "Incremental" usually means the increase; "avoidable" means it goes away if you don't do it. Same idea: a cost that changes because of the decision.

  • Differential revenue = difference in revenue between alternatives.
  • Differential cost = difference in cost between alternatives.
  • Differential revenue − differential cost = the net benefit of switching.
"What represents the incremental cost?" — the answer

When a question gives you a fixed cost and a variable cost and asks what the incremental cost of producing more units is, the answer is the variable cost. Total fixed cost doesn't change within the relevant range, so it contributes zero to the incremental cost of one more unit. The incremental cost of n extra units = variable cost per unit × n.

Worked Example — Incremental Cost

A company currently makes 10,000 units. Variable cost is $6 per unit and total fixed cost is $80,000. What is the incremental cost of producing 6,000 more units?

Show solution
Total cost at 10,000 units: Variable 10,000 × $6 = $ 60,000 Fixed $ 80,000 Total $140,000 Total cost at 16,000 units: Variable 16,000 × $6 = $ 96,000 Fixed $ 80,000 ← unchanged Total $176,000 Incremental cost = $176,000 − $140,000 = $36,000 Shortcut: 6,000 extra units × $6 = $36,000

Fixed cost contributed nothing to the incremental amount. That's the entire point of the question.

03

Direct vs. Indirect Costs

Review item: "Define and give example"

Before you can call a cost direct or indirect, you have to name the cost object — the thing you're measuring the cost of. A cost object can be a product, a job, a department, a store, a customer, anything. The same cost can be direct to one object and indirect to another.

TypeDefinitionExamples
Direct cost Can be easily and conveniently traced to a specific cost object. Wood in a table (object = the table); wages of the worker assembling Job 214 (object = Job 214); salary of the Columbus store manager (object = Columbus store)
Indirect cost Cannot be easily and conveniently traced to the cost object; must be allocated using some reasonable base. Factory rent, factory utilities, factory insurance, the plant supervisor's salary, glue and screws, depreciation on factory equipment
Common cost A specific kind of indirect cost: one cost that supports several cost objects at once and can't be traced to any one of them individually. The factory building's rent shared by three product lines; a CEO's salary shared by all divisions
The Two Magic Words

"Easily and conveniently." It's not about whether tracing is possible — you could theoretically count the exact drops of glue in one chair. It's about whether it's worth the effort. If tracing costs more than the information is worth, it's indirect.

Exam Trap — the cost object flips the answer

The factory supervisor's salary:

  • Cost object = one individual product → indirect (she supervises everything, can't trace to one unit)
  • Cost object = the manufacturing department → direct (she works only for that department)

Always read what the cost object is before answering.

Check yourself — direct or indirect?

Cost object = one bicycle made by a bike manufacturer.

  • Steel tubing for the frame → Direct (traceable material)
  • Wages of the assembler who builds it → Direct (traceable labor)
  • Lubricant used on all machines → Indirect (not worth tracing — indirect material)
  • Factory janitor's wages → Indirect (indirect labor)
  • Depreciation on the frame-welding machine → Indirect (allocated across all bikes)
  • Salary of the bike company's CFO → Indirect to the bike — and it's a period cost, not manufacturing at all
04

Product Costs vs. Period Costs

Review item: "Product cost vs. period cost — what ARE the product costs?"

This classification answers one question: when does the cost hit the income statement?

PRODUCT COSTS = Direct Materials + Direct Labor + Manufacturing Overhead → attach to the product, sit in INVENTORY (an asset) → expensed as COGS only when the product is SOLD PERIOD COSTS = Selling expenses + Administrative expenses → expensed on the income statement in the period incurred → never touch inventory
The Three Product Costs (memorize this list)
ComponentWhat it isExamples
Direct Materials (DM)Raw materials that become an integral part of the finished product and can be easily traced to itSteel in a car, flour in bread, fabric in a shirt, the circuit board in a laptop
Direct Labor (DL)Labor costs that can be easily traced to individual units — "touch labor"Assembly-line worker wages, machine operator wages, carpenter building the cabinet
Manufacturing Overhead (MOH)All other manufacturing costs — everything that happens inside the factory that isn't DM or DLIndirect materials, indirect labor, factory rent/utilities/insurance/depreciation, factory supervisor salary, factory maintenance
The One-Line Test for MOH

Ask: "Did this cost happen inside the factory?" If yes, and it isn't DM or DL, it's MOH. If it happened in the office or in sales, it's a period cost — it never enters inventory.

Same Cost, Different Answer — the classic trap pairs
CostClassification
Depreciation on factory equipmentProduct cost → MOH
Depreciation on office equipmentPeriod cost → Administrative
Factory utilities / rent / insuranceProduct cost → MOH
Office or showroom utilities / rent / insurancePeriod cost
Production supervisor's salaryProduct cost → MOH (indirect labor)
Sales manager's salaryPeriod cost → Selling
Wages of assembly-line workersProduct cost → Direct labor
Wages of the factory janitor / security guard / materials handlerProduct cost → MOH (indirect labor)
Sales commissions, advertising, delivery to customersPeriod cost → Selling
Glue, screws, lubricants, sandpaperProduct cost → MOH (indirect materials)
Exam Trap

Product costs are also called inventoriable costs. They can sit on the balance sheet for months. If a company makes 1,000 units but sells only 700, the product costs of the 300 unsold units stay in Finished Goods Inventory — they are not expensed. All period costs for the year, however, are expensed this year regardless of what sold.

Check yourself — classify these
  • Cost of the leather in a sofa → Product / DM
  • Thread used in the sofa (tiny cost, not traced) → Product / MOH (indirect materials)
  • Wages of the sofa upholsterer → Product / DL
  • Property taxes on the factory → Product / MOH
  • Property taxes on the corporate headquarters → Period / Admin
  • Shipping the finished sofa to the customer → Period / Selling
  • Shipping raw leather in to the factory → Product / DM (freight-in becomes part of materials cost)
05

Prime Cost vs. Conversion Cost

Review item: "Prime vs. Conversion"

These are just two ways of grouping the three product costs. Nothing new gets added — you're re-slicing DM, DL, and MOH.

PRIME COST = Direct Materials + Direct Labor (the two costs you can directly trace) CONVERSION COST = Direct Labor + Manufacturing Overhead (what it costs to CONVERT raw materials into a finished product)
Direct Labor is in BOTH

DL appears in prime cost and conversion cost. That means Prime + Conversion ≠ Total Product Cost — you'd be double-counting direct labor. If a problem gives you prime and conversion and asks for total product cost:

Total Product Cost = Prime + Conversion − Direct Labor
Memory Hook

PRIME = the PRIMary, traceable stuff (materials + the hands that touch it).
CONVERSION = what it takes to convert material into product (labor + the factory around it). Materials aren't part of converting — they're the thing being converted.

Worked Example — Backing Into a Missing Number

A company reports: Direct materials $85,000 · Direct labor $60,000 · Manufacturing overhead $95,000.
Compute prime cost, conversion cost, and total product cost. Then: if prime cost is $145,000 and conversion cost is $155,000, what is MOH?

Show solution
Prime cost = DM + DL = 85,000 + 60,000 = $145,000 Conversion cost = DL + MOH = 60,000 + 95,000 = $155,000 Total product = DM + DL + MOH = 85,000 + 60,000 + 95,000 = $240,000 Check the shortcut: Prime + Conversion − DL = 145,000 + 155,000 − 60,000 = $240,000 ✓ Backing into MOH: Conversion − DL = MOH → 155,000 − 60,000 = $95,000 ✓
06

Variable, Fixed, and Mixed Costs

Review item: "Define, examples" + "how each changes as activity increases"

Cost behavior means: what happens to this cost when activity goes up? Activity could be units produced, machine-hours, direct labor-hours, miles driven, patients seen. Every cost behavior question has two halves — in total and per unit — and they almost always behave oppositely.

Variable Cost

Definition: total cost changes in direct proportion to activity. Per unit, it stays constant.

Examples: direct materials, direct labor (when paid per unit), sales commissions, shipping costs per package, cups and lids at a coffee shop, electricity to run production machines.

Fixed Cost

Definition: total cost stays constant regardless of activity (within the relevant range). Per unit, it decreases as activity rises, because you're spreading the same dollars over more units.

Examples: factory rent, straight-line depreciation, the plant manager's salary, property taxes, insurance, an annual software license.

Relevant range: the band of activity over which the fixed-cost assumption actually holds. Make 10× more units and you'd need a second building — rent would jump. Fixed means fixed inside the relevant range only.

Mixed (Semi-Variable) Cost

Definition: contains both a fixed component and a variable component. Total cost rises as activity rises, but not proportionally — the line starts above zero.

Examples: a utility bill with a $2,500 base charge plus $0.35 per machine-hour; a cell plan with a flat fee plus per-GB overage; a salesperson paid a base salary plus commission; equipment rental with a flat fee plus per-hour charge; maintenance costs.

The Behavior Table — the single most-tested thing in Ch. 1
Cost typeTOTAL cost as activity ↑PER-UNIT cost as activity ↑
VariableIncreases proportionallyStays constant
FixedStays constantDecreases
MixedIncreases, but not proportionallyDecreases (because of the fixed piece)
Memory Hook — the X pattern

Variable and fixed are mirror images. Draw an X:
Variable: total moves ↗, per unit flat →
Fixed: total flat →, per unit moves ↘
Whatever is constant in total is variable per unit, and vice versa.

Exam Trap

"Fixed cost per unit" is the most dangerous number in managerial accounting. It looks like a per-unit cost you can multiply, but it changes every time volume changes. Never use average fixed cost per unit to predict the cost of extra units — the extra units cost you only the variable amount.

07

Y = a + bX, and the Cost-Per-Unit Computations

Review item: "Y = a + bx — parts??" + compute avg/total variable & fixed

Every mixed cost can be written as a straight line. This one equation runs through the whole course — you'll use it again in Ch. 2 to estimate total manufacturing overhead.

Y = a + bX Y = TOTAL MIXED COST at the given activity level (the answer / dependent variable) a = TOTAL FIXED COST (the y-intercept — where the line crosses at zero activity) b = VARIABLE COST PER UNIT OF ACTIVITY (the slope — the rate) X = LEVEL OF ACTIVITY (units, machine-hours, DLH — the independent variable) bX = TOTAL VARIABLE COST
How to Read It on an Exam

If a problem says "Utilities cost $2,500 per month plus $0.35 per machine-hour," then a = $2,500 and b = $0.35, so Y = 2,500 + 0.35X. At 20,000 machine-hours: Y = 2,500 + 0.35(20,000) = 2,500 + 7,000 = $9,500. Of that, $2,500 is fixed and $7,000 is variable.

The Four Computations
Total variable cost = variable cost per unit × units (b × X) Average variable cost = total variable cost ÷ units → ALWAYS = b, constant Total fixed cost = given, and does NOT change (a) Average fixed cost = total fixed cost ÷ units → CHANGES with volume Total cost = total variable + total fixed (Y) Average total cost = total cost ÷ units
Worked Example — The Full Cost-Behavior Grid

Buckeye Co. has variable costs of $6.00 per unit and total fixed costs of $80,000. Fill in the grid at 10,000 units and at 16,000 units, and explain each movement.

Show solution
Measure10,000 units16,000 unitsDirection
Total variable cost$60,000$96,000↑ Increases proportionally
Average variable cost / unit$6.00$6.00→ Constant
Total fixed cost$80,000$80,000→ Constant
Average fixed cost / unit$8.00$5.00↓ Decreases
Total cost (Y)$140,000$176,000↑ Increases, not proportionally
Average total cost / unit$14.00$11.00↓ Decreases
Work shown: Total VC @10,000 = 6.00 × 10,000 = $60,000 @16,000 = 6.00 × 16,000 = $96,000 Avg VC @10,000 = 60,000 ÷ 10,000 = $6.00 @16,000 = 96,000 ÷ 16,000 = $6.00 Total FC = $80,000 at both levels (relevant range) Avg FC @10,000 = 80,000 ÷ 10,000 = $8.00 @16,000 = 80,000 ÷ 16,000 = $5.00 Total cost @10,000 = 60,000 + 80,000 = $140,000 @16,000 = 96,000 + 80,000 = $176,000 Avg total @10,000 = $14.00 @16,000 = $11.00 Equation form: Y = 80,000 + 6X

Why average total cost fell $3.00: entirely from fixed cost spreading ($8.00 → $5.00). The variable piece never moved. That's the whole lesson.

Exam Trap

If you're given total cost at one volume and asked for total cost at another, do not scale the whole thing. Break it into fixed and variable first, scale only the variable piece, then add the fixed back. Scaling $140,000 by 1.6 gives $224,000 — wrong by $48,000.

08

Traditional vs. Contribution Format Income Statement

Review item: "Traditional vs. Contribution format"

Two income statements, same company, same period, same bottom line. The only difference is how the costs are grouped on the way down.

Traditional FormatContribution Format
Organized by function: production vs. selling & admin Organized by behavior: variable vs. fixed
Required for external reporting (GAAP) Used internally for management decisions
Key subtotal: Gross Margin Key subtotal: Contribution Margin
Can't tell how costs will change with volume Built for CVP analysis, break-even, what-if decisions
TRADITIONAL CONTRIBUTION ───────────────────────── ───────────────────────── Sales Sales − Cost of Goods Sold − Variable expenses (variable mfg + variable S&A) = GROSS MARGIN = CONTRIBUTION MARGIN − Selling & Admin expenses − Fixed expenses (fixed mfg + fixed S&A) = NET OPERATING INCOME = NET OPERATING INCOME ← same number
What Contribution Margin Actually Means

CM = the dollars left after covering variable costs. Those dollars go first to cover fixed costs; anything past that is profit. That's why it's called "contribution" — it's what each sale contributes toward fixed costs and profit.

CM per unit = Selling price per unit − Variable cost per unit.

Worked Example — Build Both Statements

Scarlet Co. sold 10,000 units at $25. Manufacturing costs: variable $100,000, fixed $40,000. Selling & administrative: variable $20,000, fixed $50,000. Prepare both formats.

Show solution

Traditional format (group by function):

Sales (10,000 × $25)$250,000
Cost of goods sold ($100,000 variable + $40,000 fixed mfg)140,000
Gross margin110,000
Selling & administrative ($20,000 variable + $50,000 fixed)70,000
Net operating income$40,000

Contribution format (group by behavior):

Sales$250,000
Variable expenses ($100,000 mfg + $20,000 S&A)120,000
Contribution margin130,000
Fixed expenses ($40,000 mfg + $50,000 S&A)90,000
Net operating income$40,000
Same NOI: $40,000 ✓ CM per unit = 130,000 ÷ 10,000 = $13.00 (check: price $25.00 − variable per unit $12.00 = $13.00) Variable cost per unit = 120,000 ÷ 10,000 = $12.00 Note how the SAME $40,000 of fixed manufacturing cost sits inside COGS on the traditional statement, but gets pulled out and grouped with fixed S&A on the contribution statement.
Exam Trap

Gross margin ≠ contribution margin. Gross margin subtracts all manufacturing costs (variable and fixed). Contribution margin subtracts all variable costs (manufacturing and selling/admin). They're slicing the same pile along different lines.

CH. 2

Job-Order Costing: Calculating Unit Product Costs

Computation chapter — this is where the points are
09

What Costs Get Applied as MOH — and Why We Estimate

Review item: "What type of costs are applied as MOH?"

In job-order costing, DM and DL are traced directly to each job — you know exactly how much steel and how many labor-hours went into Job 214. Manufacturing overhead can't be traced, so it must be applied using a rate.

What Goes Into MOH

All indirect manufacturing costs — everything in the factory that isn't direct materials or direct labor:

CategoryExamples
Indirect materialsGlue, screws, solder, lubricants, sandpaper, cleaning supplies, small parts not worth tracing
Indirect laborFactory supervisors, janitors, security guards, maintenance techs, materials handlers, quality inspectors, idle time, overtime premium
Factory facility costsFactory rent, factory utilities, factory property taxes, factory insurance
Factory equipmentDepreciation on factory buildings & machinery, equipment repairs and maintenance
Exam Trap — what to EXCLUDE from MOH

These are period costs and never enter manufacturing overhead, no matter how tempting:

  • Sales commissions and salaries
  • Advertising
  • Administrative / executive salaries
  • Depreciation on office equipment or the sales showroom
  • Office rent, office utilities, office supplies
  • Shipping finished goods to customers

A problem will hand you a list of 12 costs and expect you to pick out only the factory ones. Sort every line with the question: factory floor, or office?

Why a PREDETERMINED Rate? (three reasons)
  1. Actual overhead isn't known until year-end. Managers need job costs now — for bidding, pricing, decisions.
  2. Actual overhead is incurred unevenly. Heating bills spike in January; a big repair hits in March. A job finished in January shouldn't be charged more overhead than an identical job in July.
  3. Actual output varies month to month. A slow month would spread fixed overhead over few units and make the same product look wildly more expensive.

The fix: set one rate before the year begins, based on estimates, and use it all year long. That's the predetermined overhead rate.

Normal Costing

This approach is called normal costing: actual direct materials + actual direct labor + applied overhead (estimated rate × actual activity). Two of the three pieces are actual; only overhead is estimated.

10

Estimating Total MOH (a Mixed Cost) & the Predetermined Rate

Review item: "Compute Estimated MOH (mixed cost) & POHR"

Total manufacturing overhead is itself a mixed cost — part of it is fixed (rent, depreciation, supervisor salary) and part varies with activity (utilities to run machines, indirect materials). So you estimate it with the same equation from Module 07.

STEP 1 — Estimate total MOH using the mixed-cost equation: Y = a + bX Y = estimated TOTAL manufacturing overhead cost a = estimated total FIXED manufacturing overhead b = estimated VARIABLE overhead per unit of activity X = estimated total ACTIVITY (DLH, MH, units — the allocation base) STEP 2 — Divide by the estimated activity: Predetermined Overhead Rate = Estimated Total MOH Cost ───────────────────────── Estimated Total Activity (base)
Four Things to Notice
  • Every number in the POHR formula is an ESTIMATE. Nothing actual goes in the rate.
  • The rate is computed before the period begins and used for the whole period.
  • The allocation base (X) should be whatever drives overhead — direct labor-hours in a labor-heavy shop, machine-hours in an automated one.
  • The same X appears in both steps: you use estimated activity to estimate the cost, then divide by that same estimated activity.
Worked Example — Estimated MOH & POHR

Buckeye Machining estimates fixed manufacturing overhead of $120,000 for the year, plus variable manufacturing overhead of $3.00 per direct labor-hour. It expects to work 40,000 direct labor-hours. Compute estimated total MOH and the predetermined overhead rate.

Show solution
STEP 1 — Estimated total MOH: Y = a + bX Y = $120,000 + ($3.00 × 40,000 DLH) Y = $120,000 + $120,000 Y = $240,000 STEP 2 — Predetermined overhead rate: POHR = Estimated total MOH ÷ Estimated total DLH POHR = $240,000 ÷ 40,000 DLH POHR = $6.00 per direct labor-hour Decomposed, the $6.00 rate is: $3.00 variable + $3.00 fixed ($120,000 ÷ 40,000) = $6.00
Exam Trap

Don't forget to multiply the variable rate by the estimated activity before adding the fixed piece. Students routinely compute $120,000 + $3.00 = $120,003 or just divide $120,000 by 40,000 and stop. Write out Y = a + bX every single time.

Exam Trap #2

If the question gives you variable overhead per unit of product but the allocation base is machine-hours, convert first. Everything in the equation must be in the same activity unit.

11

Applying Overhead: The Plantwide (Factory-Wide) Rate

Review items: "applied OH = rate × actual activity"; "factory-wide rate"; "factory-wide rate with 2 departments"

Once you have the rate, applying overhead is one multiplication — but notice which number is estimated and which is actual.

Overhead Applied = Predetermined Overhead Rate × ACTUAL Activity (estimated) (actual) Apply to one job: POHR × actual activity USED BY THAT JOB Apply for the year: POHR × actual TOTAL activity for the year
The Rule That Prevents Half of All Errors

The RATE is estimated. The ACTIVITY is actual. Estimated activity is used only to build the rate — it is never used again after that. Once the rate exists, every application uses actual hours/units.

A "Plantwide" or "Factory-Wide" Rate

One single rate for the entire factory. You add up estimated overhead from every department, divide by estimated activity from every department, and get one rate that every job pays regardless of which department it passes through.

Plantwide POHR = Estimated TOTAL overhead for the whole factory ────────────────────────────────────────────── Estimated TOTAL activity for the whole factory
Worked Example A — Applying the Plantwide Rate

Buckeye Machining's POHR is $6.00 per DLH (from Module 10). During the year the factory actually worked 38,000 direct labor-hours. How much overhead was applied for the year?

Show solution
Applied overhead = POHR × ACTUAL DLH = $6.00 × 38,000 = $228,000 NOT $6.00 × 40,000 = $240,000. The 40,000 was only used to build the rate. It's done its job.
Plantwide Rate Across Two Departments

Here's the version your review sheet calls out. Buckeye has two departments, but still uses one factory-wide rate. You sum both departments' estimates to build the rate, then apply it to a job using that job's total activity across both departments.

Worked Example B — One Plantwide Rate, Two Departments

Buckeye Machining has two departments. Estimates for the year:

DepartmentEst. MOHEst. DLHEst. Machine-Hours
Molding$180,00025,00030,000
Assembly$60,00015,0005,000
Total$240,00040,00035,000

Job 214 actually used: Molding — 20 DLH and 60 machine-hours; Assembly — 40 DLH and 2 machine-hours.
Using a single plantwide rate based on direct labor-hours, how much overhead is applied to Job 214?

Show solution
STEP 1 — Build ONE rate from the factory totals: Plantwide POHR = Total est. MOH ÷ Total est. DLH = $240,000 ÷ 40,000 DLH = $6.00 per DLH STEP 2 — Total the job's ACTUAL activity across BOTH departments: Molding 20 DLH Assembly 40 DLH Total 60 DLH STEP 3 — Apply: Overhead applied to Job 214 = $6.00 × 60 DLH = $360 Note: the machine-hours are IGNORED here. With a plantwide rate based on DLH, machine-hours are just distractor data.

Why this matters: Molding is machine-intensive but only uses 25,000 of the 40,000 labor-hours. A plantwide DLH rate charges Molding jobs based on labor they barely use — so machine-heavy jobs get undercosted and labor-heavy jobs get overcosted. That's the setup for Module 12.

Exam Trap

With a plantwide rate and two departments, add the job's hours across departments and multiply once. Don't compute a separate rate per department — that's a different question (Module 12). Read carefully whether the problem says "plantwide/factory-wide" or "departmental/multiple rates."

12

Multiple Predetermined Overhead Rates (Departmental)

Review items: "Compute multiple POHRs"; "total overhead for a job with multiple departmental rates"

A plantwide rate assumes one activity drives all the overhead in the whole factory. That's usually false. A multiple predetermined overhead rate system gives each department its own rate, with its own allocation base — machine-hours where machines drive costs, labor-hours where people do. More accurate, more work.

For EACH department: Departmental POHR = Estimated MOH for THAT department ───────────────────────────────────── Estimated ACTIVITY for THAT department Then, for a job: Total OH applied = Σ (each dept's rate × that job's ACTUAL activity in that dept)
The Procedure — 3 Steps, Every Time
  1. Compute a separate rate for each department using that department's own estimates and that department's own base.
  2. Multiply each rate by the job's actual activity in that department.
  3. Add the department amounts together for the job's total applied overhead.
Worked Example — Departmental Rates on Job 214

Same Buckeye data, but now each department gets its own rate. Molding allocates overhead on machine-hours; Assembly allocates on direct labor-hours.

DepartmentEst. MOHAllocation baseEst. base activity
Molding$180,000Machine-hours30,000 MH
Assembly$60,000Direct labor-hours15,000 DLH

Job 214 actually used: Molding — 60 machine-hours; Assembly — 40 direct labor-hours.

Show solution
STEP 1 — Departmental rates: Molding = $180,000 ÷ 30,000 MH = $6.00 per machine-hour Assembly = $ 60,000 ÷ 15,000 DLH = $4.00 per direct labor-hour STEP 2 — Apply each rate to Job 214's actual activity in that dept: Molding $6.00 × 60 MH = $360 Assembly $4.00 × 40 DLH = $160 STEP 3 — Add: Total overhead applied to Job 214 = $360 + $160 = $520
MethodOH applied to Job 214
Plantwide rate ($6.00/DLH × 60 DLH)$360
Departmental rates ($360 + $160)$520
Difference$160

Job 214 is machine-heavy in Molding. The plantwide DLH rate undercosted it by $160. If Buckeye priced this job off the plantwide number, it under-bid by $160 of real cost on every unit batch — that's the practical argument for departmental rates.

Exam Trap

Each department's rate must be divided by its own base — don't accidentally divide Molding's overhead by total factory hours. And when applying, use the job's hours in that department only, measured in that department's base. Molding's 20 DLH are irrelevant if Molding allocates on machine-hours.

When Does the Answer Differ?

Plantwide and departmental rates give the same total overhead for the factory as a whole, but different amounts per job. The split changes; the pie doesn't.

13

Total Job Cost, Unit Product Cost, and Sales Price

Review items: "Compute total job cost / unit product cost / sales price"

This is the payoff of the whole chapter — and it's usually the last part of a multi-part problem, so getting the rate right earlier is what earns these points.

Total Job Cost = Direct Materials + Direct Labor + Applied Overhead (actual) (actual) (POHR × actual activity) Unit Product Cost = Total Job Cost ÷ Number of Units in the Job Sales Price per Unit = Unit Product Cost × (1 + markup %) or equivalently: Unit Product Cost + (Unit Product Cost × markup %) Total Job Price = Total Job Cost × (1 + markup %)
Direct Labor Cost vs. Direct Labor Hours

Problems often give you direct labor hours and a wage rate separately. Direct labor cost = hours × wage rate. Then those same hours may also be the allocation base for overhead. One number, two jobs — don't mix up the labor cost with the overhead applied.

Worked Example — Job 214 All the Way Through

Job 214 at Buckeye Machining (plantwide rate, $6.00 per DLH):

  • Direct materials requisitioned: $1,200
  • Direct labor: 60 hours at $22.00 per hour
  • Job produced 40 units
  • Company prices jobs at cost plus a 60% markup

Compute total job cost, unit product cost, and sales price per unit.

Show solution
Direct materials$1,200.00
Direct labor (60 hrs × $22.00)1,320.00
Applied overhead (60 DLH × $6.00)360.00
Total job cost$2,880.00
Unit product cost = Total job cost ÷ units = $2,880 ÷ 40 units = $72.00 per unit Sales price per unit = $72.00 × (1 + 0.60) = $72.00 × 1.60 = $115.20 per unit Total job price = $2,880 × 1.60 = $4,608 (check: $115.20 × 40 units = $4,608 ✓)

Same job under departmental rates (overhead $520 instead of $360):

Total job cost = 1,200 + 1,320 + 520 = $3,040 Unit product cost = $3,040 ÷ 40 = $76.00 Sales price = $76.00 × 1.60 = $121.60 per unit The costing system you choose changes the price you quote.
Exam Trap — markup ON cost, not margin

"Cost plus 60% markup" means multiply cost by 1.60. It does not mean the price is such that profit is 60% of the price. If a question instead says "a 60% gross margin" or "markup on sales price," that's price = cost ÷ (1 − 0.60). Read the wording.

Exam Trap #2

Never put selling or administrative costs into a job cost. Only DM, DL, and applied MOH. Sales commission on the job? Period cost. Excluded.

CH. 3

Job-Order Costing: Cost Flows & External Reporting

Follow the dollars through the accounts, then close the books
14

The Flow of Costs and the Type of Each Account

Review item: "Know the flow above and the type of each account"

Manufacturing costs move through three inventory accounts in a strict order, then become an expense. Draw this on your scratch paper the second the exam starts.

Purchases │ ▼ RAW MATERIALS ──direct materials──▶ WORK IN PROCESS ──jobs──▶ FINISHED GOODS ──sold──▶ COGS (asset) │ (asset) completed (asset) (expense) │ ▲ └─indirect materials─▶ MOH──┘ (clearing) applied Indirect labor, factory ▲ utilities, factory depr. ─────┘ (ACTUAL costs, debited) Selling & Admin costs ──▶ EXPENSE immediately (NEVER enters this flow)
Account Types
AccountTypeWhat sits in it / normal balance
Raw MaterialsAsset (inventory)Materials purchased but not yet used. Debit balance. Balance sheet.
Work in Process (WIP)Asset (inventory)Jobs started but not finished — holds their DM + DL + applied MOH. Debit balance. Balance sheet.
Finished GoodsAsset (inventory)Completed jobs not yet sold. Debit balance. Balance sheet.
Manufacturing OverheadClearing / temporaryNot a real asset or expense. Debited for ACTUAL overhead, credited for APPLIED overhead. Closed to zero at year-end.
Cost of Goods SoldExpenseCost of units actually sold. Debit balance. Income statement.
Selling & Admin ExpenseExpensePeriod costs, expensed immediately. Never goes through inventory.
The MOH T-Account — Understand This and Ch. 3 Opens Up
MANUFACTURING OVERHEAD ──────────┬─────────── DEBIT │ CREDIT ACTUAL │ APPLIED │ indirect mat. │ POHR × actual indirect labor │ activity factory util. │ factory depr. │ factory ins. │ ──────────┴─────────── Debits > Credits → UNDERapplied (actual exceeded applied) Credits > Debits → OVERapplied (applied exceeded actual)
Exam Trap — what to EXCLUDE from the flow

Selling and administrative costs never enter Raw Materials, WIP, Finished Goods, or MOH. They go straight to expense. When a problem lists "depreciation, $80,000 — of which 75% is factory and 25% is office," only the factory 75% is debited to MOH. The office 25% is debited to Depreciation Expense.

Memory Hook — "Debit Actual, Credit Applied"

Say it out loud. DA-CA. Actual overhead costs flow in on the debit side; applied overhead flows out to WIP on the credit side. Every MOH question is answered by knowing which side a number belongs on.

15

The Full Set of Journal Entries

Review item: "Know flow, what dr./cr., what exclude, journal entries"

Nine entries cover the entire manufacturing cycle. Learn them in order — each one is just the flow diagram written as a debit and a credit.

#EventJournal Entry
1Purchase raw materialsDR Raw Materials
   CR Accounts Payable / Cash
2Issue materials to productionDR Work in Process  (direct materials)
DR Manufacturing Overhead  (indirect materials)
   CR Raw Materials
3Record factory laborDR Work in Process  (direct labor)
DR Manufacturing Overhead  (indirect labor)
   CR Wages / Salaries Payable
4Incur other actual factory overheadDR Manufacturing Overhead
   CR Cash / A.P. / Accum. Depreciation / Prepaid Insurance
5Apply overhead to jobsDR Work in Process
   CR Manufacturing Overhead

amount = POHR × actual activity
6Incur selling & admin costsDR Selling Expense / Admin Expense
   CR Cash / A.P. / Accum. Depreciation

NOT overhead — never touches WIP
7Jobs completedDR Finished Goods
   CR Work in Process

amount = Cost of Goods Manufactured
8Goods sold (two entries)DR Accounts Receivable / Cash
   CR Sales  (at selling price)


DR Cost of Goods Sold
   CR Finished Goods  (at cost)
9Close under/overapplied overheadIf UNDERapplied:
DR Cost of Goods Sold
   CR Manufacturing Overhead


If OVERapplied:
DR Manufacturing Overhead
   CR Cost of Goods Sold
The Two Entries Everyone Confuses

Entry 4 (actual overhead) debits MOH. Entry 5 (applied overhead) credits MOH. They are separate entries, made at different times, for different amounts. Applying overhead never touches Cash or Payables — it only moves a number from the MOH clearing account into WIP.

Exam Trap — the sale is TWO entries

Recording a sale requires both the revenue entry (at selling price) and the cost entry (at cost). Losing the second entry is one of the most common points lost on this exam.

Worked Example — Entries with Numbers

Scarlet Fabrication for the year: purchased raw materials $145,000 on account; requisitioned $141,000 of materials, of which $9,000 was indirect; incurred factory labor of $190,000 ($155,000 direct, $35,000 indirect); incurred factory utilities $28,000 (on account) and recorded factory equipment depreciation $62,000; applied overhead of $144,000; incurred sales commissions of $50,000 in cash. Write the entries.

Show solution
1) DR Raw Materials 145,000 CR Accounts Payable 145,000 2) DR Work in Process 132,000 ← 141,000 − 9,000 direct DR Manufacturing Overhead 9,000 ← indirect materials CR Raw Materials 141,000 3) DR Work in Process 155,000 ← direct labor DR Manufacturing Overhead 35,000 ← indirect labor CR Wages Payable 190,000 4a) DR Manufacturing Overhead 28,000 CR Accounts Payable 28,000 4b) DR Manufacturing Overhead 62,000 CR Accumulated Depreciation 62,000 5) DR Work in Process 144,000 ← POHR × actual activity CR Manufacturing Overhead 144,000 6) DR Selling Expense (commissions) 50,000 CR Cash 50,000 ↑ period cost — does NOT go to MOH or WIP
16

The Schedules & Under/Overapplied Overhead

Review items: "Materials used, COGM, COGS, Adjusted COGS"; "Under/overapplied? Impact? JE?"

The schedules are just the T-accounts written vertically. Every one of them follows the identical pattern: Beginning + Additions − Ending = What left the account.

RAW MATERIALS USED IN PRODUCTION Beginning raw materials inventory + Purchases of raw materials = Raw materials available for use − Ending raw materials inventory = Raw materials USED in production − Indirect materials (→ goes to MOH, not WIP) = DIRECT MATERIALS used in production SCHEDULE OF COST OF GOODS MANUFACTURED (COGM) Direct materials used + Direct labor + Manufacturing overhead APPLIED ← applied, NOT actual = Total manufacturing costs added during the period + Beginning work in process inventory − Ending work in process inventory = COST OF GOODS MANUFACTURED (= cost of jobs COMPLETED) SCHEDULE OF COST OF GOODS SOLD Beginning finished goods inventory + Cost of goods manufactured = Goods available for sale − Ending finished goods inventory = UNADJUSTED COST OF GOODS SOLD + Underapplied overhead (or − Overapplied overhead) = ADJUSTED COST OF GOODS SOLD
Under- vs. Overapplied Overhead
Under/Overapplied = ACTUAL overhead incurred − Overhead APPLIED Actual > Applied → UNDERapplied → you didn't charge jobs enough → COGS is UNDERSTATED → ADD to COGS (DR COGS, CR MOH) Applied > Actual → OVERapplied → you charged jobs too much → COGS is OVERSTATED → SUBTRACT from COGS (DR MOH, CR COGS)
Memory Hook

UNDER = ADD. OVER = SUBTRACT. Under-applied means you under-charged your jobs, so costs are too low — add the shortfall back. Over-applied means you over-charged, so costs are too high — take it out.

Or think about the direction of the entry: underapplied leaves a debit balance in MOH, so you close it with a debit to COGS (COGS goes up). Overapplied leaves a credit balance, closed with a credit to COGS (COGS goes down).

The "Impact" Question

If a question asks about the effect: underapplied overhead increases COGS, which decreases gross margin and decreases net operating income. Overapplied does the reverse — decreases COGS, increases net operating income. And yes, a journal entry is required; MOH must be closed to zero.

Worked Example — All Four Schedules, Start to Finish

Scarlet Fabrication, for the year just ended. POHR is $6.00 per machine-hour; actual machine-hours were 24,000.

ItemBeginningEnding
Raw materials inventory$18,000$22,000
Work in process inventory$30,000$25,000
Finished goods inventory$40,000$36,000

During the year: raw material purchases $145,000; indirect materials used $9,000; direct labor $155,000; indirect labor $35,000; factory utilities $28,000; factory equipment depreciation $62,000; factory insurance $18,000. Also: sales commissions $50,000, administrative salaries $70,000, office equipment depreciation $12,000, advertising $25,000.

Required: (a) direct materials used, (b) actual total MOH, (c) applied MOH and whether over/underapplied, (d) COGM, (e) unadjusted COGS, (f) adjusted COGS, (g) the closing journal entry.

Show solution

(a) Materials used in production

Beginning raw materials $ 18,000 + Purchases 145,000 = Raw materials available 163,000 − Ending raw materials (22,000) = Raw materials USED 141,000 − Indirect materials (→ MOH) (9,000) = DIRECT MATERIALS used $132,000

(b) Actual manufacturing overhead — factory costs only

Indirect materials $ 9,000 Indirect labor 35,000 Factory utilities 28,000 Factory equipment depreciation 62,000 Factory insurance 18,000 = ACTUAL total MOH $152,000 EXCLUDED (period costs): Sales commissions $50,000 Administrative salaries 70,000 Office equip. depr. 12,000 Advertising 25,000 ← none of these touch MOH

(c) Applied overhead & the variance

Applied MOH = POHR × ACTUAL machine-hours = $6.00 × 24,000 MH = $144,000 Actual $152,000 − Applied $144,000 = $8,000 UNDERAPPLIED (Actual > Applied, so we under-charged the jobs.)

(d) Cost of goods manufactured

Direct materials used $132,000 + Direct labor 155,000 + Manufacturing overhead APPLIED 144,000 ← applied, not actual = Total manufacturing costs 431,000 + Beginning work in process 30,000 = Total cost in process 461,000 − Ending work in process (25,000) = COST OF GOODS MANUFACTURED $436,000

(e) Unadjusted cost of goods sold

Beginning finished goods $ 40,000 + Cost of goods manufactured 436,000 = Goods available for sale 476,000 − Ending finished goods (36,000) = UNADJUSTED COGS $440,000

(f) Adjusted cost of goods sold

Unadjusted COGS $440,000 + Underapplied overhead 8,000 ← UNDER = ADD = ADJUSTED COGS $448,000

(g) Closing journal entry

DR Cost of Goods Sold 8,000 CR Manufacturing Overhead 8,000 This brings the MOH clearing account to a zero balance. Impact: COGS ↑ $8,000, gross margin ↓ $8,000, net operating income ↓ $8,000.
Exam Trap — the three biggest schedule errors
  1. Using actual MOH in the COGM schedule. It's always applied. Actual overhead only shows up when you compute the over/under variance.
  2. Forgetting to subtract indirect materials. "Raw materials used" includes both direct and indirect. Only the direct portion goes into COGM; the indirect portion goes to MOH.
  3. Flipping the beginning/ending signs. Beginning inventory is always ADDED, ending inventory is always SUBTRACTED, in all three schedules. No exceptions.
Working Backwards

Problems love to give you COGM and ask for ending WIP, or give you COGS and ask for beginning FG. Every schedule is a four-variable equation — write out the whole schedule with a blank in the unknown spot and solve. Never try to do it in your head.

Formula Sheet

Everything computational, in one place — reproduce this from memory before you walk in
Chapter 1 — Cost Concepts & Behavior
Product cost = Direct Materials + Direct Labor + Manufacturing Overhead Period cost = Selling expenses + Administrative expenses Prime cost = Direct Materials + Direct Labor Conversion cost = Direct Labor + Manufacturing Overhead Total product cost = Prime + Conversion − Direct Labor Mixed cost: Y = a + bX Y = total mixed cost a = total fixed cost b = variable cost per unit of activity X = activity level bX = total variable cost Total variable cost = variable cost/unit × units Average variable cost = total VC ÷ units → constant Average fixed cost = total FC ÷ units → falls as volume rises Total cost = total VC + total FC Average total cost = total cost ÷ units Incremental (differential) cost = variable cost per unit × additional units TRADITIONAL CONTRIBUTION Sales Sales − Cost of goods sold − Variable expenses = Gross margin = Contribution margin − Selling & admin expenses − Fixed expenses = Net operating income = Net operating income CM per unit = Selling price per unit − Variable cost per unit
Chapter 2 — Job-Order Costing
Estimated total MOH = Est. fixed MOH + (Est. variable MOH rate × Est. activity) i.e. Y = a + bX Estimated total manufacturing overhead cost POHR = ───────────────────────────────────────────── Estimated total amount of allocation base Overhead applied = POHR × ACTUAL activity ← rate estimated, activity ACTUAL Plantwide rate = Total est. factory MOH ÷ Total est. factory activity (apply using the job's TOTAL activity across all depts) Departmental rate= Dept's est. MOH ÷ Dept's est. activity Job's total OH = Σ (dept rate × job's actual activity in that dept) Total job cost = DM + DL + Applied MOH Unit product cost = Total job cost ÷ units in the job Sales price/unit = Unit product cost × (1 + markup %) Direct labor cost = DL hours × wage rate per hour
Chapter 3 — Cost Flows
Raw materials used = Beg. RM + Purchases − End. RM Direct materials = Raw materials used − Indirect materials COGM = DM used + DL + MOH APPLIED + Beg. WIP − End. WIP Unadjusted COGS = Beg. FG + COGM − End. FG Under/overapplied = Actual MOH − Applied MOH Positive → UNDERapplied → ADD to COGS (DR COGS, CR MOH) Negative → OVERapplied → SUBTRACT from COGS (DR MOH, CR COGS) Adjusted COGS = Unadjusted COGS + Underapplied (or − Overapplied)

Flashcards

Click the card to flip · 68 cards · filter by chapter
Question Ch. 1
Loading…
Click card to flip
1 / 68

One-Page Cheat Sheet

The night-before scan — print this page and read only this
Managerial vs. Financial
  • Internal vs. external users
  • No GAAP vs. GAAP required
  • Future vs. past
  • Segments vs. whole company
  • Relevance/timeliness vs. precision
  • Optional vs. mandatory & audited
Decision Costs
  • Opportunity = benefit given up; never recorded; always relevant
  • Sunk = already spent; always irrelevant (book value is sunk)
  • Differential/incremental = the change between alternatives = the variable cost
Direct vs. Indirect
  • Direct = easily and conveniently traced to the cost object
  • Indirect = must be allocated
  • Common cost = indirect cost shared by several objects
  • Answer depends on the cost object — read it first
Product vs. Period
  • Product = DM + DL + MOH → inventory → COGS when sold
  • Period = selling + admin → expensed now
  • Test: factory floor or office?
  • Prime = DM + DL · Conversion = DL + MOH
  • DL is in both — don't double count
Cost Behavior (memorize)
  • Variable: total ↑ proportional · per unit constant
  • Fixed: total constant · per unit ↓
  • Mixed: total ↑ not proportional · per unit ↓
  • Y = a + bX → a = total FC, b = VC/unit, X = activity, bX = total VC
Income Statements
  • Traditional: by function → Gross Margin
  • Contribution: by behavior → Contribution Margin
  • Same net operating income both ways
  • GM subtracts all mfg; CM subtracts all variable
The POHR
  • Est. total MOH ÷ Est. total activity
  • All estimates, computed before the year
  • Est. MOH is mixed → Y = a + bX
  • Applied = rate × ACTUAL activity
  • Plantwide: one rate, sum the job's hours across depts
  • Departmental: each dept's own rate & base, then add
Job Costing Math
  • Total job cost = DM + DL + applied MOH
  • Unit cost = total job cost ÷ units
  • Price = unit cost × (1 + markup)
  • No selling/admin in a job cost, ever
The Flow
  • RM → WIP → FG → COGS
  • RM, WIP, FG = assets · COGS = expense
  • MOH = clearing account, closed to zero
  • Debit actual, credit applied
  • S&A costs never enter the flow
Key Journal Entries
  • Issue materials: DR WIP + DR MOH / CR RM
  • Labor: DR WIP + DR MOH / CR Wages Payable
  • Apply OH: DR WIP / CR MOH
  • Complete: DR FG / CR WIP
  • Sell: DR A/R / CR Sales and DR COGS / CR FG
The Schedules
  • Pattern: Beg + Additions − End
  • RM used = Beg RM + Purch − End RM
  • DM = RM used − indirect materials
  • COGM = DM + DL + applied MOH + Beg WIP − End WIP
  • COGS = Beg FG + COGM − End FG
Over / Under Applied
  • Actual − Applied
  • UNDER = ADD to COGS · DR COGS, CR MOH · NOI ↓
  • OVER = SUBTRACT from COGS · DR MOH, CR COGS · NOI ↑
  • A JE is always required — MOH must end at zero
Managerial Accounting · Exam 1 Learner · Chapters 1–3 · Progress stored locally in your browser